Customers Recent Projects

Customers

        Proline Partial Customers List ...

North America

Pipeline Contractors
    Banister Pipeline
    Carson Welding & Maintenance
    Flint Construction
    Kendal Pipeline
    Ledcor Industries
    Louisbourg Pipelines
    Marine Pipeline
    Midwest General Contractor
    North American Construction
    Northern Provincial Pipelines
    O.J. Pipelines
    Surerus Construction
    Transline Pipeline
    Waschuk Pipeline

Pipeline Owning Companies
    Alliance Pipeline
    B.C. Gas
    Enbridge Pipelines
    Conoco Canada
    Mobil Oil
    Nova Chemicals
    Pacific Northern Gas
    Petro Canada
    Sherritt International
    Suncor Energy
    Syncrude Canada
    TransCanada Pipeline
    Westcoast Energy

International

   China - CNPC, Liaohe Number 1 Oilfield Construction Company,    CPPLB, Liaohe Number 2 Oilfield Construction Company, CPECC,    Zhongyuan Petroleum Exploration Bureau, Huabei Petroleum    Administration Bureau.
   Algeria - Cosider, Kanaghaz, GTP, Sonelgaz, Sonatrach, ENAC.
   Pakistan - Sui Northern Gas, Sui Southern Gas,
   Kazakhstan - Arctic Construction, Hurricane Kumkol
   Kenya - Kenya Pipeline Company
   Cuba - CUPET
   Bolivia - Transredes
   Malaysia - Petronas
   Germany - Otto Wolff
   Qatar - Medgulf Construction
   Venezuela - CANSPEC
   Russia - Flint
   Yemen - Nexen
   Australia - McConnell Dowell


back to top

Recent Projects

The Duke Energy “Grizzly” Project

Proline was a key supplier of pipeline equipment for the Duke Energy “Grizzly” Project. Duke Energy contracted Surerus Construction of Fort St.John, B.C. and Kendal Pipeline of Grande Prairie, Alberta to build the 16" natural gas pipeline. Construction of approximately 105 km of pipeline occurred in some of the most extreme terrain and weather conditions known to pipeline professionals. Crossing over northeastern B.C. and northwestern Alberta, the pipeline cost an estimated $55 million to build.

The TransCanada Chancellor Extension Project

Another project that Proline equipment was proven was the Chancellor Extension project. TransCanada Pipelines contracted Midwest General Contractors to construct approximately 15 kilometres of 42" natural gas pipeline in the Hussar, Alberta area. The contractor had to deal with unpredictable Alberta spring weather from rain to sun to intermittent snow storms creating very muddy right of way conditions.

Proline supplied specialized pipeline equipment consisting of a 42" self contained Hydraulic Pipe Bending Mandrel with remote control operation, 42" Pipe Facing Machine and Power Unit, 42" Internal Line-up Clamps with Copper Back up systems installed for use with the customers external automatic welding system.

Alliance Pipeline Project

PROLINE was one of the main suppliers of pipeline equipment and supplies for The Alliance Pipeline Project. The project involved construction of a 36 and 42" high pressure natural gas pipeline from Fort St. John, British Columbia, Canada to Chicago, Illinois, U.S.A.

The pipe was welded using mechanized (automatic) welding in the U.S.A. & Canada. There were three (3) Canadian contractors working on the Canadian portion. All three Canadian contractors and one U.S.A. company relied on PROLINE equipment and /or supplies.

U.S. Pipelines welded the first joint of the Alliance Pipeline Project, using PROLINE’s pneumatic internal copper back-up clamp.





back to top

About Proline | News & Events| Products | Services | Contact / Locations | Customers / Recent Projects | Sitemap
© PROLINE Pipe Equipment. All rights reserved. Website Designed by Primal Tribe Inc.